
Using AMSE PTC 6 Testing to Improve Steam Turbine Performance
By Dave Cavanaugh, Sr. Project Engineer GSE Engineering, Programs…

How (and Why) Using DVR Modeling Will Improve Power Plant Performance
As featured in POWER Magazine May 2021 issue.
Traditional…

Three Reasons Why You Should Outsource Your Inspection Scope Optimization
An Inspection Scope Optimization (ISO) for Flow Accelerated Corrosion…

Multiple Methodologies for Inspection Scope Optimization: Which is right for you?
What is the process for performing an Inspection Scope Optimization?
Inspection…

Predicting Wear: How to use Pass 2 Analysis
The documentation of a Pass 2 Analysis can have a wide range…

Data, Risk and Turbines
By Frank Todd, Manager Thermal Performance
Featured in EnergyTech Magazine
We all have had to make a decision based on information that we were not quite sure was reliable, knowing that the decision could cost us quite a packet (English slang for a whole